07-10-2013, 12:43 AM
It was a busy day yesterday and a lot of glue has been used.....
The two wet/dry bins from Walthers are taller and much more detailed than expected. I hope the matching elevators have no problem with the overhead cabinet and it's doors.
ps. MAW understood my track length constrains and ran trains suitable for me
http://farm3.staticflickr.com/2105/57847...133d_b.jpg
The two wet/dry bins from Walthers are taller and much more detailed than expected. I hope the matching elevators have no problem with the overhead cabinet and it's doors.
ps. MAW understood my track length constrains and ran trains suitable for me
http://farm3.staticflickr.com/2105/57847...133d_b.jpg
Reinhard