Freelance 2013-2 (MAW)
#51
Two towers support a conveyor bridge connecting the old concrete silo with the new wet and dry bin. The right end of the bridge will be connected to a leg servicing grain dryer, truck loading and truck unloading facilities.

[Image: file_zps6c1c5f4d.jpg]
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)