The second leg got installed. It got a custom connection to the belt conveyor of the wet/dry bin. This connection is like a "hand" on the bridge and the foot of the leg has two nails stick in the cork ground to ride on. That is a flexible mounting base convenient during assembly of the complex..
[Image: file_zpsebb89bfd.jpg]

The second surge bin to be used for truck loading arrived today. The baseplate got modified to act as the truck unloading bin and got connected to the leg.
[Image: file_zpsbd378722.jpg]

The components are connected via belt conveyors at the ground. The glue is still white... will set until tomorrow. Sorry, the bin connection are cheat only. I did plan to late for the ground conveyors and could not reach the bottoms of the wet and dry bin anymore.
[Image: file_zps2cbffc17.jpg]
Reinhard