Freelance 2013-3
#1
I am opening a new topic to cover the migration of my layout from rural to urban based scenery.
The urban freelance ISL shall be located "somewhere" where green vegetation is mostly present (e.g. from Wisconsin to Georgia) and the timeframe should be kept flexible between 1975 and today.
That should permit a lot of different scenarios by exchanging street and rail cars and locomotives only.

A short review of the steps done already but covered in the old thread of Freelance 2012 (MAW)

It started with an older industry at the front track of the east industry
[Image: IMG_2764_zps1522a511.jpg]
[Image: IMG_2736_zps56e8362f.jpg]
[Image: IMG_2737_zps491e3bbb.jpg]

Next step was the revitalization of an older structure placed at the west industry lead. It got a nice gate too.
[Image: IMG_2763_zpsf1e28176.jpg]
[Image: IMG_2747_zps632f0834.jpg]
[Image: IMG_2765_zps20f1e0ae.jpg]

Current project is an industry at the rear track of the east industry.
[Image: IMG_2759_zpsc4d427b2.jpg]
[Image: IMG_2760_zps52a2180b.jpg]

And an overview of all buildings forming the east industry
[Image: IMG_2761_zps2ad42e61.jpg]

I will proceed from here reporting the ongoing transition into an urban ISL.
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)