03-27-2014, 05:47 AM
A lot of us make the mistake of putting down too much track trains that are too long. A small switching layout with 2 industries can be satisfying. For example, you could have a food processor and a manufacturing company with a plethora of car types being used. You just don't have to use all of the cars at once. A small 3 track yard with 4-6 cars being switched would work wonderfully.
Mike Kieran
Port Able Lines
" If the world were perfect, it wouldn't be " - Yogi Berra.
Port Able Lines
" If the world were perfect, it wouldn't be " - Yogi Berra.