11-29-2014, 10:06 AM
The new building closes a gap at the north side of the east brick canyon
There is some mess in the yard while the glue is still wet. The fire escape got protected because it is to low mounted for trucks but the people use that safety area as a junk yard
The 0-5-0 engineer looks at the roof too
and he gets gets an overview how it fits into the building ensemble
That completes the restructuring of the East End
East End from the track side
East End from the street side
ps. There is a West End too ......
There is some mess in the yard while the glue is still wet. The fire escape got protected because it is to low mounted for trucks but the people use that safety area as a junk yard
The 0-5-0 engineer looks at the roof too
and he gets gets an overview how it fits into the building ensemble
That completes the restructuring of the East End
East End from the track side
East End from the street side
ps. There is a West End too ......
Reinhard