Freelance 2014-2
The very first step is done for some buildings.
The door and windows openings got fine adjusted to fit the door and window frames, the walls got sanded to fit together. Some are distorted and need some reworks. The amount of white dust and powder created is amazing....... Finally the walls are glued together with CA glue. This not my most preferred work.

I need to see the home improvement market tomorrow to get fast set two component glue for solid assembly and wood strips to support the roofs.
Spraying with white primer from the rattle can on the balcony might become a problem. Temperatures are dropping around and below freezing point. Some paint behaves funny below a certain temperature.
[Image: IMG_3807_zpsed0d5919.jpg]
[Image: IMG_3806_zps6be54fe7.jpg]
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)