NY&A ISL
#1
I have a new track plan for an NY&A switching layout. I took the foundation of the Palmetto Spur plan and added a Bushwick Branch feel to it. The layout will be 8 feet long x 16 inches with a 4 foot removable extension which will include the other end to a runaround. It will have a mixture of industries from the Palmetto Spur plan and sidings found in Bushwick Terminal. I could never compete with Kurt's Bushwick Terminal layout so mine will be semi-freelance. This is the plan I came up with, i'm not great with the track programs but it gives you the idea.

[Image: isl_zps998932cb.png]

Somewhere in the first 12 inches of the layout will be a grade crossing, and all turnouts are #6. The siding marked with a #1 is going to be a food processor which was on the Pal. Spur plan and will have the same 3 car spot of a tank car, reefer and boxcar. #2 will be a warehouse with a 3 car spot of boxcars. I decided to go with a team track where the runaround creates some extra track space at #3, it's similar to Bushwick Terminal and will be able to accommodate 2 cars which will include gondolas and bulkhead flats of pipe and rebar, covered hoppers of plastic pellets, boxcars of brick and when the team track is slow I can store stone cars destined for Kings Material (which would be located off the layout on the track above the team track). #4 which was the team track for the Pal. Spur will most likely be a warehouse with a 3 car spot of boxcars. Then #5 will be a paper company that will have a 1 car spot of hi-cube boxcars. I'm happy with the plan and think theres plenty of space to switch the industries and creates the use of a wide variety of cars, and I could probably use occasional CSX power since it still has some Palmetto Spur DNA. I probably won't be able to start building for another week or so until everything gets unpacked (moving tomorrow) so thoughts and recommendations are welcomed.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)