Wyoming valley super Mike kitbash
#76
A few more details done today.

I installed the straps that hold the plumbing to the firebox, installed an aux reservoir under the cab, and some airlines under the firebox.
   

And on the front end I corrected the length of the boiler supports, They were too long, played around with the steps on the boiler front and added the strainer line to the feed water heater. To do this I had to relocate the front handrail station a little more forward. Also the steam feed to the power reverse was added.    

I need to get the sander lines from the LHC so that the other plumbing can be completed.
 My other car is a locomotive, ARHS restoration crew  
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)