New home - New layout
#14
I am having a bit of rethink, I can make a little more space by adding back the part on the left hand side, but it will be a removable cassette type staging, thus keeping the domestic authorities happy...

So now the lumber yard is gone, the plywood factory is on the left and the industry along the back will be a packaging manufacturer, the spur along the front is used by the rail road for car storage and as a team track.

[Image: Rethink_zpskqqqgdny.jpg]

Plywood factory - Loads in = Stake cars with logs, chemical tankers with adhesive

Packaging manufacturer - Loads in = Box cars with paper / card pulp, Covered hopper with corn starch. Loads out = Box cars with waste paper

Team track - Center beams with Lumber, Hoppers with sand, etc. Plus storage of unused cars for the rail road, this will include Wood chip cars, as I have a few of them that need an excuse to get on the layout!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)