01-14-2016, 10:18 AM
I have made some revisions to the plan:
I have swapped out the plywood factory for a lumber yard, as much as I like the idea of the plywood factory I struggle with how plausible the concept is, plus I have loads of stuff to outfit a lumber yard / building suppliers yard that I want to use.
I can still have the log cars and wood chip cars on the layout, they will just have to be on the storage spur at the front.
I have also added a covered loading area to the cardboard manufacturer, this will allow the covered hoppers of corn starch to be unloaded under cover.
I have swapped out the plywood factory for a lumber yard, as much as I like the idea of the plywood factory I struggle with how plausible the concept is, plus I have loads of stuff to outfit a lumber yard / building suppliers yard that I want to use.
I can still have the log cars and wood chip cars on the layout, they will just have to be on the storage spur at the front.
I have also added a covered loading area to the cardboard manufacturer, this will allow the covered hoppers of corn starch to be unloaded under cover.