New home - New layout
#15
I have made some revisions to the plan:

[Image: Rethink%201_zpsg4kcsw8n.png]

I have swapped out the plywood factory for a lumber yard, as much as I like the idea of the plywood factory I struggle with how plausible the concept is, plus I have loads of stuff to outfit a lumber yard / building suppliers yard that I want to use.

I can still have the log cars and wood chip cars on the layout, they will just have to be on the storage spur at the front.

I have also added a covered loading area to the cardboard manufacturer, this will allow the covered hoppers of corn starch to be unloaded under cover.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)