02-25-2016, 01:38 AM
Hi,
made some progress on the mill area. I put in some foam. This will be the base for scenery later.I also build a Pikestuff bridge and put it in place. There will be a dirt road going over the bridge and downhill to the mill. I place some old structures around to see, if my trackplan will work. The tracks will be glued to 5mm kork and the structures will be placed on 10mm styropor.
But next step is to finish the backdrop for that area, put a piece of plywood to the end of the woodchiptrack and to put the backdrop up behind the mill. I bought some fine wiremesh to cover the odd shaped space between the backdrop and the mainline...so a lot of things to do before I could continue on the helix.
Regards,Chris
made some progress on the mill area. I put in some foam. This will be the base for scenery later.I also build a Pikestuff bridge and put it in place. There will be a dirt road going over the bridge and downhill to the mill. I place some old structures around to see, if my trackplan will work. The tracks will be glued to 5mm kork and the structures will be placed on 10mm styropor.
But next step is to finish the backdrop for that area, put a piece of plywood to the end of the woodchiptrack and to put the backdrop up behind the mill. I bought some fine wiremesh to cover the odd shaped space between the backdrop and the mainline...so a lot of things to do before I could continue on the helix.
Regards,Chris
Building the BC-Rail Dawson Creek Subdivision in H0 scale http://bigbluetrains.com/forum/viewtopic.php?f=46&t=7835