06-01-2016, 04:45 AM
Hi,
I made some progress last week on the new liftout and have done some basic landscping. The sharp curves are gone and I made a straight part for the liftout. It looks much better and I hope it will worke better when it´s finished.
Left track is the spur to G.E.R.N. with the liftout, right track is the main heading east to Alberta. It ends in front of the wall behind the roadbridge. I´ll use it as an interchange with the NAR/CN.
I started the basic trrain with foam and will use a hot wire cutter for more shaping and the fine part will done with sandpaper. The top will be coverd with plastercloth. I don´t know if I´ll stay with the residences or will build some downtown area on this place.I´ll decide that when the terrain shape is finished.
Here are some more pictures of that area.
Looking back from G.E.R.N.
I hope to get some more work done this week with more landscaping...
Regards,Chris
I made some progress last week on the new liftout and have done some basic landscping. The sharp curves are gone and I made a straight part for the liftout. It looks much better and I hope it will worke better when it´s finished.
Left track is the spur to G.E.R.N. with the liftout, right track is the main heading east to Alberta. It ends in front of the wall behind the roadbridge. I´ll use it as an interchange with the NAR/CN.
I started the basic trrain with foam and will use a hot wire cutter for more shaping and the fine part will done with sandpaper. The top will be coverd with plastercloth. I don´t know if I´ll stay with the residences or will build some downtown area on this place.I´ll decide that when the terrain shape is finished.
Here are some more pictures of that area.
Looking back from G.E.R.N.
I hope to get some more work done this week with more landscaping...
Regards,Chris
Building the BC-Rail Dawson Creek Subdivision in H0 scale http://bigbluetrains.com/forum/viewtopic.php?f=46&t=7835