03-23-2009, 12:31 PM
Well...........
I don't believe it, but the CVR is 100% track laid and wired, including the 19 tortoise switches installed and working.
Now to run it for awhile and test the trackage.
Then on to scenery, structures and detailing... My favourite three parts.
I don't believe it, but the CVR is 100% track laid and wired, including the 19 tortoise switches installed and working.
Now to run it for awhile and test the trackage.
Then on to scenery, structures and detailing... My favourite three parts.
Will Annand
CVR in N Scale
<!-- w --><a class="postlink" href="http://www.muskokacomputes.com/CVR-Home.html">www.muskokacomputes.com/CVR-Home.html</a><!-- w -->
CVR in N Scale
<!-- w --><a class="postlink" href="http://www.muskokacomputes.com/CVR-Home.html">www.muskokacomputes.com/CVR-Home.html</a><!-- w -->