The Credit Valley Railway circa 1900
#91
Wow, the year is flying by.

Let's see what I have accomplished...

Well, March and April have been written off as far as the CVR is concerned as I was assisting with the MC&H Central, a display layout in our shop. <!-- m --><a class="postlink" href="http://www.muskokacomputes.com/Shop-Layout.html">http://www.muskokacomputes.com/Shop-Layout.html</a><!-- m -->

As for the CVR, let's check the current "To Do" list:

1. Put decoders in 6 locomotives.

2. Two locomoives to bash into one.

4. Check couplers and weight on 12 pieces of rolling stock (and counting).

5. An 18cm high by 62cm long trestle to build.

6. About 34 structures to build (so far).

7. Scenery to do on a 5.3sq metre layout.


Hmmm!!!

Very little changed, except I did check out about 24 pieces of rolling stock and clear them for use on the CVR.
Will Annand
CVR in N Scale
<!-- w --><a class="postlink" href="http://www.muskokacomputes.com/CVR-Home.html">www.muskokacomputes.com/CVR-Home.html</a><!-- w -->
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)