Track maintenance/cleaning
#7
Hello!
I also had the secrets of jerky running of my Genesis MP15AC although i have had made the modification with the 3-point suspension as described in the linked thread:
<!-- l --><a class="postlink-local" href="http://bigbluetrains.com/forum/viewtopic.php?f=23&t=3766">viewtopic.php?f=23&t=3766</a><!-- l -->
The MP15 began irregular and jerky running and even stalling again. But this time i found there was no more a reliable electric connection between the the rotating axle stubs and the axle cup bearings. So in bridged them with a sort of wiper.
After the modification of the power pick ups no stalling anymore. I think this problem is cured.

Here is the same for Blue Box and RTR switchers:
<!-- l --><a class="postlink-local" href="http://bigbluetrains.com/forum/viewtopic.php?f=23&t=7568">viewtopic.php?f=23&t=7568</a><!-- l -->

But all is depending on each other:
- keep wheels clean
- keep all wheels permanent onto the railheads, no airtime allowed
- keep tracks clean
- convert dead frogs to livin ones
- eliminate dead pointblades, this is often a hidden problem which appears when dust and dirt collecting in the course of time between point blads and outer rails. So it is possible the point blades are el. dead.

Greetings
Lutz
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)