04-28-2015, 09:07 PM
I started construction on the modules on the 21st of April and completed the basic modules on the 22nd of April. I now need to transpose the track plan to the plywood top and start gluing down cork. I will use HO scale for the mainline and N-scale cork for the rest of the tracks. I plan on using all Micro Engineering #6 switches and ME code 83 rail.