Madras Switching Layout HO Scale
#47
That looks very good. How did you do the ballasting of the left hand track? It looks to my like street running done with ballast only and the ballast is very even distributed. Are the rails still a tad higher than the ground cover?
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)