05-01-2015, 07:26 AM
Stephan, you omitted the staging yard at the very bottom. I think there should be a drill track at least. It might be a removable cassette with a track used as an entry and exit point of the jobs serving the industry.
An alternative would be to shorten the run around as suggested and move the switch of the run around 3 - 4 car length up
An alternative would be to shorten the run around as suggested and move the switch of the run around 3 - 4 car length up
Reinhard