CNR Kensington sub
#38
I was able to finally get the rest of the freight cars and track off of my bench work this afternoon and was ready to lay track.

[Image: image.jpg1_zpszc2y12cm.jpg]

[Image: image.jpg2_zps4cgx7x2r.jpg]

I had planned to reuse my Peco switches and new Micro Engineering code 70 rail when I came to the realization that I had code 100 switches and the rail looks huge beside the code 70 track. So, after a few minutes of pricing new switches with tax came to almost $400 Eek I decided to stick with the present switches and reuse my code 100 rail again. Not my first choice but one I can afford since I already have everything on hand.
Stephen 

Modeling a freelanced, present day short line set in Nova Scotia, Canada. 

https://bigbluetrains.com/showthread.php?tid=9643
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)