2 6x1 foot ISLs
#4
Depending upon the era being modelled and the industries being served, it is plausible for double slip switches to be used to gain access to those shippers. If the shipper[s] is/are of particularly high value/volume then the railroad will make the effort to gain access even if it means building a bridge [within reason of course], or a vehicle overpass or even setting up a car float operation. In his book Planning for Realistic Operation, John Armstrong gave as an example how a railroad had an overpass constructed so that they could access a factory precinct [today's industrial park equivalent] that required rail service.
Compared to building a small bridge over a road or river or building a overpass, having two double slip switches made is relatively cheap as all switch-work is custom made anyway so the incremental cost is not as great as it is for us modellers.
Besides who isn't looking for a way to incorporate one or more double slip switches to add interest.
Mark
Fake It till you Make It, then Fake It some More
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)