HO gauge switching layout: Shenandoah Valley
#23
Thanks for the advice Catweasel and BR60103, I've tried what you've advised and that makes a difference. I will have to hunt down a plexi-glass cutting knife for when I next want to cut some thick styrene.

Over the last two nights I have built and painted the rail stops I recently received (thanks again to those people who helped me out with that!) I have also done the basic painting of the corn syrup control building. I have also attempted to some more trees - but still not good enough yet for photos.

The next task will be to weather the control building - I have just got some supplies to do so in the post this morning Thumbsup

Actually, the next task is to wrap Christmas presents, then I can do some modelling.

Lesson for the day - look at the prototype. So, walking back from the local post office I took some photos of trees to study (quite a few actually).


Attached Files Image(s)
                   
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)