end of the spur
#22
Once the track was secured, everything was wire up, point control is by a on-on slide switch, barbeque skewer and bike spokes .
   

After thorough testing to make sure everything worked ok, it was on with the buildings, all made out of 2mm MDF and 10mm square timber, fixed on to 6 mm MDF bases
   
   
   
   

next job will be to clad these with plasticard

Ray
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)