Once the track was secured, everything was wire up, point control is by a on-on slide switch, barbeque skewer and bike spokes .
After thorough testing to make sure everything worked ok, it was on with the buildings, all made out of 2mm MDF and 10mm square timber, fixed on to 6 mm MDF bases
next job will be to clad these with plasticard
Ray
After thorough testing to make sure everything worked ok, it was on with the buildings, all made out of 2mm MDF and 10mm square timber, fixed on to 6 mm MDF bases
next job will be to clad these with plasticard