end of the spur
#33
All the buildings were painted before being fixed to the layout, while these were drying I painted the sky and installed the layout lighting, which is a strip of led lights (cool white),glued to a 30 degree angled batten (this will also hold the front fascia) I had allow for 2 strips ,but was really please how bright one strip worked out.
Bricks were weathered, down spouts fixed, roller doors made and fixed and some of the smaller detail added before fixing
   
   
   
below is a overall view of the layout with just the led lights, they work really well Thumbsup Applause

   
Next job was to scratch build the foot bridge from the car park into the building
   

You may have noticed a little black thing in those photos, it's one of the plant switchers, the owners of the plant are rail fans, so there group of restore switchers will do all plant switching (just an excuses to run some Alco's and early emd's)

That's it till after Christmas, back in the new year., All the best to everyone. Cheers

Ray
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)