08-27-2011, 07:17 PM
Finally for now is the east main switch into the facility. I still have to install the cork roadbed under the main and wire it but this is where it will be. The main will extend beyond into a planned expansion in the hopefully not to distant future. Hope you enjoyed the pics and sorry it;s been so long. Take care and see you next time.
CandO7430 (The poster formerly known as IandOFan71)
T. Blackstone,
Division Superintendent,
Ohio Div, Chessie System Railroads
T. Blackstone,
Division Superintendent,
Ohio Div, Chessie System Railroads