HO Grand Trunk 2-8-0 (Class D2)
#16
Today's progress include a new cab roof and a few cab details. There's still some fine work and details to add, but this is going in the right direction and definitely looks like an early 20th locomotive.

[Image: IMG_1378b_zpsxoznghja.jpg]

I also completed the boiler straps. However, I found out the lower running board means I'll have to add boiler bands under the locomotive weight/lowe boiler. I'm not sure if it will look good once painted as Russian iron. No, adding low running board on a Bachmann 2-8-0 is not an easy task. They are attached to the plastic shell AND metal weight. Not a good thing when you want to keep the shell removable. I'll have to come up with a practical solution about that. Also, the steam pipes out of the cylinders will have to go away.

I also started to cut running boards to length and carved the turret with a large drill bit. Safety valves will be added later.

The next step is to complete the boiler once for all, pre-drill all the appliance holes and make removable pipings. It won't be easy, but at least piping is minimal. I gave a few thoughts about the pilot and the scratchbuilding way is the best in term of time, price and results. Some parts including a new air pump, headligh and spoked pilot wheels are ordered. Unfortunately, I have now idea when I'll get them. At least, they won't prevent me from completing the model and they can easily be added later on.

Matt
Proudly modelling Quebec Railway Light & Power Company since 1997.

Hedley-Junction Club Layout: http://www.hedley-junction.blogspot.com/

Erie 149th Street Harlem Station http://www.harlem-station.blogspot.com/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)