11-26-2016, 11:12 AM
Well, I'm getting close to the final trackwork I'll be doing. I may have a few tweaks from here but over all I'm happy with the tacks. I have worked the elevations and I can get 3.5" clearance from track to track with a max of 2.45% grade. Not to bad I figure for even running a container car if I like. I'll add those details soon.
The added yard to the left area can be worked later. For now I need to get the rest of the track work done so we can run trains. My son is getting to a point he thinks this will never happen (he's 4 so it's been a long time). I fixed the space around the cement plant so I can get a yard in there with a little room for scenery. I'm open to hear what you folks think.
Dave
The added yard to the left area can be worked later. For now I need to get the rest of the track work done so we can run trains. My son is getting to a point he thinks this will never happen (he's 4 so it's been a long time). I fixed the space around the cement plant so I can get a yard in there with a little room for scenery. I'm open to hear what you folks think.
Dave