My home layout - from planning to completion
#8
Well folks, I'm sure you figure the day would never come when I was doing more then just a track plan. LOL Here are a couple progress shots of what I've been doing. You can see the bench work is done and I'm laying down the sub terrain foam work now. I have some bugs (ha ha some) to work out like the placement of bridges and the location of the quarry. I want that set before I start cutting the plywood for the below grade quarry. The bridges are getting worked out as I do the sub terrain area. The layout has a bus line wired all over below the top. I plan to hand cloth below the top to cover all the mess below the layout. I also plan to have some carpet or other for the walkways. I have noticed the floor is cold with only the peel and stick tiles.

I'm sure I could go on and drive you all crazy so I'll just post the photo and let you go back to what you are doing.

[Image: 33274355975_26caa24d4a_k.jpg]

[Image: 33233175776_3079d931d7_k.jpg]

Dave
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)