Layout Plan
#3
Tyson Rayles Wrote:Myself I would go with plan A but lose the reverse loops and use the space they took up for industrial sidings and scenery. Run the railroad as a point to point like a real RR.
Thanks for the reply Mike, Mike I have a very difficult time accepting the point to point concept as I have always enjoyed simply running trains . I have automation available for the reverse loops, even the notion of doing operations sessions by myself is all new to me and its simply an option I would like to incorporate into the plan, for all I know I may enjoy switching out industrys.
Lynn

New Adventure <!-- l --><a class="postlink-local" href="http://bigbluetrains.com/forum/viewtopic.php?f=46&t=9245">viewtopic.php?f=46&t=9245</a><!-- l -->

Great White North
Ontario,Canada
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)