Freelance 2017-1
#23
The support structure is aligned and glued to the base. The bridges are set in place.

The rod has been replaced! The prototype uses something like a large hook to lift the coils too. May be I try that too.http://media.al.com/mobile-press-registe...-large.jpg

Everything must set until some weathering will be applied. May be some warning signs are fine too.
I did not add the crane operator cabin. I think a hand held operating console hanging at a cable might be more likely.

[Image: 31443606613_9bb8c4edbd_c.jpg]IMG_5303 by faraway52, on Flickr
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)