04-22-2017, 01:47 PM
Had a couple of diversions come my way recently and haven't been able to move forward with the H-9 project till today. I found some really really thin styrene in my styrene drawer and was able to manufacture a door from it after a few tries.
and was able to put it in place.
Got a window made for the engineer's side too from one of the failed attempts at making a door.
I also touch up a few things on the boiler that my big ole' fingers had messed up and I think the boiler is now ready for priming.
and was able to put it in place.
Got a window made for the engineer's side too from one of the failed attempts at making a door.
I also touch up a few things on the boiler that my big ole' fingers had messed up and I think the boiler is now ready for priming.