I've been quiet on the layout front as of late, because I've been working on one of the more mind numbing parts of the build - laying cobbles between the rails, and carving the roadway. There's about 30" of this to do, and I'm about half way through it.
Afterwards it'll get sand between the cobbles, then the whole thing will be getting painted and weathered. I am hoping to have it done by the end of the week.
Once that's done, I can get get started on the Georgia Hardware Company building which will go over and around the cobbled street/tracks.
Between these, I'll be working on ground cover on this module, which will hopefully complete the basic scenery for the whole layout, and with loads of time to get it done ready for the Bingham show in 10 days time.
Afterwards it'll get sand between the cobbles, then the whole thing will be getting painted and weathered. I am hoping to have it done by the end of the week.
Once that's done, I can get get started on the Georgia Hardware Company building which will go over and around the cobbled street/tracks.
Between these, I'll be working on ground cover on this module, which will hopefully complete the basic scenery for the whole layout, and with loads of time to get it done ready for the Bingham show in 10 days time.