The M-K & Eastern RR
#30
Some more progress on the layout.

[Image: 42062891844_6c70d4db2f_c.jpg]
Almost 80% of the benchwork is ready. The ones left to do are the curve sections.
I've also added the first 5/8" plywood roadbed.
I will use plywood roadbed on the stations and yards. The inclines and upper tracks will be spline roadbed.
 
Spline raw material made from1/4" MDF that I sawed into 1" strips.
[Image: 41879636105_964ef7546b_c.jpg]
 
Tracks and turnouts. I laid out some Peco turnouts to make sure the roadbed will fit the plan.
[Image: 41879636155_4b05eba55d_c.jpg]
 
Laser cut sweep sticks for HOn3. These are invaluable!
I got these made by a friend in the US.
[Image: 42062891694_9fef5effbc_c.jpg]
 
It might be possible to lay the first tracks this weekend.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)