Viperman's HO layout progress
#45
Got some work done a couple days ago! Not usual for me to be up there during the week, so I had to take advantage of the opportunity.

I checked on the rock walls in the rock cut, and they look really good the way they are. I need to do very little touching up on them, they already have the bumps and dips that you would see on a rock face, plus some minor cracks that I can either hide easily, or blend them into the scenery like some minor cracks in the rocks. Thumbsup

[Image: MYlayout-32.jpg]

Then (with the help of my son) I used some WS risers to form a road (thanks Nazgul for the idea!!!) where the trucks will come down off the hill where the bridge will be, and leads down to the lake area where the lumber mill area is.

An overall shot of this scene:
[Image: MYlayout-33.jpg]

And another angle:
[Image: MYlayout-31.jpg]
-Steven-

The Zealot progress thread: <!-- m --><a class="postlink" href="http://www.zealot.com/forum/showthread.php?t=112267">http://www.zealot.com/forum/showthread.php?t=112267</a><!-- m -->
The current progress thread: <!-- l --><a class="postlink-local" href="http://www.the-gauge.net/forum/viewtopic.php?f=17&t=923">viewtopic.php?f=17&t=923</a><!-- l -->
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)