03-08-2014, 06:03 PM
Another work day at Scranton. We did some more grinding..
Some more rust proofing...
We removed the brake valves so they could be sent out to be refurbished...
And I finished up the front terminal block and started the main cabinet. The wires draped out of the side are spares that we ran, they will get tucked out of the way inside the splice box. ...
Some more rust proofing...
We removed the brake valves so they could be sent out to be refurbished...
And I finished up the front terminal block and started the main cabinet. The wires draped out of the side are spares that we ran, they will get tucked out of the way inside the splice box. ...
My other car is a locomotive, ARHS restoration crew