Posts: 5,263
Threads: 195
Joined: Apr 2009
A Cornerstone surge bin kit arrived and got assembled into two halves. Waiting for another kit to get four halves in total. The surge bins make nice small silos less dominating than the standard grain silos.
There will be little progress over the next days. Waiting for the other surge bin but more important painting the outside window frames is scheduled for Monday.
That requires the removal of the lift out section in front of the door. A delicate process with a certain risk of not perfect aligned tracks due to moisture and heat variations.
Reinhard
Posts: 146
Threads: 7
Joined: Apr 2011
faraway Wrote:A Cornerstone surge bin kit arrived and got assembled into two halves. Waiting for another kit to get four halves in total. The surge bins make nice small silos less dominating than the standard grain silos.
Nice!. Great tip that on assembling the kit into 2 halves.
Posts: 568
Threads: 36
Joined: Aug 2010
Reinhard
There's no need to buy expensive kits when all kinds of household & other things come in plastic tubular containers to make into silos. Use pix of real silos to figure out how to "detail" them cheaply also.
Andy Jackson
Santa Fe Springs CA
ATSF/LAJ Ry Fan & Modeler
Posts: 5,263
Threads: 195
Joined: Apr 2009
lajry Wrote:Reinhard
There's no need to buy expensive kits when all kinds of household & other things come in plastic tubular containers to make into silos. Use pix of real silos to figure out how to "detail" them cheaply also.
Andy, I admit that I have no clue how to make a corrugated steel grain bin from household parts. I can also not remember to have seen something like that in the internet. For this time it's to late but I would be glad to get a pointer to a detailed how to to make my own corrugated steel grain bin in the future.
Reinhard
Posts: 5,263
Threads: 195
Joined: Apr 2009
The big ugly gap..... ready to paint the window and door frames tomorrow. Absolute no model railroading
Reinhard
Posts: 5,263
Threads: 195
Joined: Apr 2009
Got the other surge bin today. The four halves are together with a conveyor mounted on a small base plate. It is my intention to keep it as a reusable unit for later layouts. It is also easier to install in the far left rear corner (actually put in place) as one unit.
The prototype is heavy weathered. Almost dark gray / brown. I used black and brown water colors for heavy weathering.
How it blends together, view from my chair.
Reinhard
Posts: 1,639
Threads: 87
Joined: Dec 2008
Reinhard just to tease you a little bit.You could have saved yourself a lot of work simply by replacing those Purina signs with new ones that said Tropicana.
By the way I do like the new building(s) too.
Johnathan (Catt) Edwards
"The Ol Furrball"
"I'm old school,I still believe in respect"
Posts: 5,263
Threads: 195
Joined: Apr 2009
Catt Wrote:..... replacing those Purina signs with new ones that said Tropicana.....
Not Tropicana but Seminole. It is a pure coincidence but I moved from dog and cat food (Purina) to Horse feed (Seminole) :o
Reinhard
Posts: 612
Threads: 10
Joined: Feb 2011
I bet that Reinhard will change it to Tropicana in about 6 to 8 weeks time.
After all nothing says I'm modelling Florida quite like having some Tropicana reefers or better yet the Tropicana plant.
Almost feel the need for a orange juice.
Mark
Fake It till you Make It, then Fake It some More
Posts: 5,263
Threads: 195
Joined: Apr 2009
I have been tempted serval times to do something with the citrus industry. That was a quite natural choice for my SoCal layout too.
The internet is full with lots of beautiful old wooden citrus processing facilities. But they are all gone. Todays citrus facilities do not fit on small ISLs. It would be like doing coal mining at the powder river on my layout.....
Model railroading would be much easier for me if I would model the transition period. The variety of small rail served industries was much bigger.
The road is simplified, green base ground cover and fence added. The empty space in the background will be covered by a flat background building.
Reinhard
Posts: 4,696
Threads: 343
Joined: Jan 2009
Another great looking scene.
Bruce
Posts: 5,263
Threads: 195
Joined: Apr 2009
Posts: 931
Threads: 68
Joined: Dec 2008
Reinhard - the silos look good - but I'm surprised that you didn't use one of these Faller HO 130476 Two Industry Silos
Faller H0 130530 Medium feed silos - but perhaps they weren't large enough?
Posts: 5,263
Threads: 195
Joined: Apr 2009
I have those Faller silos but they are to small indeed,
Reinhard
Posts: 3,262
Threads: 115
Joined: Dec 2008
Model railroading would be much easier for me if I would model the transition period. The variety of small rail served industries was much bigger.
---------------------------------------------------------------------
Reinhard,That thought has been bugging me for the last 2-3 months and I know what era(mid 50s) and industries I have in mind.
The bigger question is should it be small (0-6-0T or 2-6-0) steam or GE 44 or 70 tonner? My ISL would represent the industrial terminus of a 2 mile switching railroad serving a industrial area.
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!