12-28-2009, 08:29 PM
Remove Old 1/4" Plywood Control panel
Install and wire New 1/4" plexiglass Control panel
Paint New Mountain (Right side) and prep both mountains for detailing
Get the Light (LED) on top of the tower to WORK again!!
OK all done Now I have the "switching Panel" to replace and then i can begin detailing the mountains...
Install and wire New 1/4" plexiglass Control panel
Paint New Mountain (Right side) and prep both mountains for detailing
Get the Light (LED) on top of the tower to WORK again!!
OK all done Now I have the "switching Panel" to replace and then i can begin detailing the mountains...
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???