07-26-2019, 08:45 AM
Placement of the main industry building is the next topic.
I started with bare structure kernels of all five buildings to get a visual impression. Did it the first time and it is a great help to have all raw buildings at a very early stage on the layout. They are made of 10mm and 5mm paper laminated foam board and can be modified with little hassle. They are 9, 10 and 11cm (about 4" +/- 2/5") tall. They will be laminated with prototype images from Streerview and further detailed later.
I started with bare structure kernels of all five buildings to get a visual impression. Did it the first time and it is a great help to have all raw buildings at a very early stage on the layout. They are made of 10mm and 5mm paper laminated foam board and can be modified with little hassle. They are 9, 10 and 11cm (about 4" +/- 2/5") tall. They will be laminated with prototype images from Streerview and further detailed later.
Reinhard