08-30-2019, 10:39 PM
Ran into a problem with sizing the arches such that one of those tracks (at least the one that passes at an angle other than 90 degrees) could run underneath. I happen to have a dbl-track curved cord bridge that I placed over that track. May have to utilize that to span some distance between 2 segments of the viaduct.