03-22-2023, 06:48 PM
Don:
My bedside clock also has a dead segment. It's the one that distinguishes an 8 from a 9,but it's in the minutes digit, so not a big error.
I changed the smoke detector batteries today. Used to do it when we changed in and out of Daylight Saving, but when they shorted the standard time to 3 months, I switched to the equinox. The batteries still showed over 9 volts because our detectors are wired into the house.
I have a little lighting unit in a service station that has a welding flash in it. This takes 9V. But I don't run it to 4 batteries worth a year. I need something else that takes 9V.
My bedside clock also has a dead segment. It's the one that distinguishes an 8 from a 9,but it's in the minutes digit, so not a big error.
I changed the smoke detector batteries today. Used to do it when we changed in and out of Daylight Saving, but when they shorted the standard time to 3 months, I switched to the equinox. The batteries still showed over 9 volts because our detectors are wired into the house.
I have a little lighting unit in a service station that has a welding flash in it. This takes 9V. But I don't run it to 4 batteries worth a year. I need something else that takes 9V.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.