Full Version: CONSTRUCTION OF NEW LINE AT THE KISKI JUNCTION RAILROAD
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4
Charlie B Wrote:
Brakie Wrote:but forget signals and crossing protection.
Charlie
Charlie;
R J Corman installed those steel ties here in Frankfort when they did their tunnel enlargement project last year. The track through the tunnel is in a crossing signal circuit. I think they have insulating pads between the ties and the rail. Train crews complain about the "weird" sound going through the tunnel as the steel ties make popping and cracking noises.
Thanks for posting all the updates! I have enjoyed following the progress. As someone else has mentioned, it is great to see rails going down instead of coming up.
Chuck
Here are a few picture of the line. The runaround is in and it is about 7200 feet long. Nice track, really feels good and the scenery is spectacular[attachment=9012][attachment=9011][attachment=9010] 10/7/2011
Charlie[attachment=9009]
Beautiful shots Charlie---looks like the Kiski Junction has been upgraded to a Class 1 railroad.
First coal train loaded at Logansport today.Here the train is northbound past Kelly's Station
[attachment=10880]
Here is the south end as they begin to get ready to load.[attachment=10879]
The first coal loaded[attachment=10878]
and a view of the overall operation.[attachment=10877]
Charlie
Here is a little video of the train today:

<!-- m --><a class="postlink" href="http://youtu.be/QKcq_R0Pqro">http://youtu.be/QKcq_R0Pqro</a><!-- m -->

Charlie
Pages: 1 2 3 4