Full Version: WPF 6/28 - 7/4
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Thought I would start a new one as we are already a couple of days into the new week.

[Image: Stockyard+1.jpg]

I finally got around to starting on my SP&S stockyard spur switching layout. I have laid out the cork, got the backdrop started, and started to plan out where some of the buildings will go. I still have some smoothing out to do on the backdrop, and then I can start painting clouds, trees and other scenic elements. I have fixed up the turnouts for the layout using PC board ties and details from Proto87 stores, once the backdrop is more complete I will start putting the track in place permanently.
Coaling tower under construction,

[attachment=18232]

[attachment=18231]
PRT 5709 & crew on there way to the NJT switch where they will wait for the all clear & head to the interchange track!!!! :o Confusedhock: Thumbsup
That looks like a rough neighborhood Kamerad,,,, May be those engines should have ghetto grills installed on them. Icon_lol
You're right it's a old Erie / Conrail line that was left for dead in the early 80's in a old industrial part of town, But the C&D load out saved it & some new things started to happen!!! (that's part of my RR story) Thumbsup
An eastbound at Enon Valley, Pa yesterday.[attachment=18254]
Charlie
I did catch a HBL train headed by a leased CR unit 9611 by the white rock salt co. today.