Full Version: Mirrored Palmetto
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5
Hi gang!

Formers for casting the 2nd road on the layout are being glued into place.

No pics, but several 3 litre BIB red wines are in use as weights.

Martin
Gumpoleon Wrote:.... but several 3 litre BIB red wines are in use as weights....
That might be dangerous. Call your friends and reduce the weight as fast as possible Wink Prost
faraway Wrote:
Gumpoleon Wrote:.... but several 3 litre BIB red wines are in use as weights....
That might be dangerous. Call your friends and reduce the weight as fast as possible Wink Prost

Can I be of assistance? Icon_lol
Cheers Cheers

The red wine is for next weekend, there will be a get-together for the entire block of flats I live in...
Work on the layout while emptying the bottles, then the soil won't seem so red. 35 Icon_lol Cheers
This is an ISL in Milwaukee. May be the track planners had to much beer.... it is absolutely not prototypical Wink
http://goo.gl/maps/vrDZs
faraway Wrote:This is an ISL in Milwaukee. May be the track planners had to much beer.... it is absolutely not prototypical Wink
http://goo.gl/maps/vrDZs

All I can say is I'm glad they didn't design and build my ISL. Icon_lol
Hi gang,

Working on how to make the loading dock at the team-track.

Option 1: a sort of "wrap around" dock
[Image: 1553180_10152548369123400_5977010962641010014_o.jpg]

Option 2: 20 ft wide with ramp facing right
[Image: 10604440_10152548369118400_2123120917980302175_o.jpg]

Option 3: 20ft wide with ramp facing left
[Image: 1889059_10152548369133400_5577452369444193313_o.jpg]


There is a grade crossing just right of the team-track scene:
[Image: 10484536_10152548380178400_5549672703101331734_o.jpg]

My own idea would be option 3, to allow unloading 2 boxcars at the dock, and also a centerbeam flat just right of the dock... I believe those cars need access from both sides?
What would be best?
I think I would go with option 3 but you will definitely need access to both sides of center beams or you may discover their tendency to "auto unload". Eek Wallbang
I also vote for option 3..
If a forklift has access on the other side of the track from the loading dock, option 3 makes the most sense.
Mike Kieran Wrote:If a forklift has access on the other side of the track from the loading dock, option 3 makes the most sense.

Put the dock between two tracks - That way you normally unload from one spur - but if you get a jammed door - and it does happen! - you can move the waggon to the other side and continue unloading, without having to run the car back to the junction to be turned - and yes, that is what I'm doing on my layout
Hi gang,

More roadwork...
[Image: 10531447_10152549189838400_5147576275336913024_o.jpg]

SOON™ done with spackle.

I decided on option #3 by the way. I'll need to figure out a way to build the concrete around the dock...
Hi gang,

While the roadwork is progressinf slowly in the West (left) of the layout, I decided to put the time while the spackle is drying to good use.

Kitbashing a pikestuff warehouse and retailstore into a much bigger Building - 160 scale feet long - perfect for hiding the staging track a bit....

[Image: 10560410_10152551679258400_1477139905484113239_o.jpg]
Kitbashing a pikestuff warehouse and retailstore into a much bigger Building - 160 scale feet long - perfect for hiding the staging track a bit....
-----------------------------------------------------------------
OOOOOH! Very nice ,Very nice indeed. Thumbsup
Pages: 1 2 3 4 5