Posts: 649
Threads: 13
Joined: Jun 2022
Heat wave means I'm inside this weekend, and working on my coal storage facility. The central elevator shaft has been built and I'm currently working on the roof shingles.
[attachment=43918][attachment=43919]
Posts: 649
Threads: 13
Joined: Jun 2022
I'm starting to figure out the designer's statement about this kit on their website: "Even though this is a simple structure, I rate it as an advanced level kit. It will probably take a month of evenings to complete." I already groaned about the multitude of hoops around the silo, and now I'm in shingle hell... Here's the front half of one of the silo roofs. It's looking pretty cool, but it's testing my fortitude.
And each peak of the three roofs gets a cap of folded shingles which end up being quite small...