For the layout addition portion of the challenge I am going to working on the Bridges Area of the Layout.
I want to accomplish the following:
Layout down the roadway and sidewalks.
Place the roadway tunnel portal.
Place the pedestrian tunnel portals.
Place the retaining walls.
Fill in behind the bridge abutments and retaining walls.
Shape the terrain at the wingwalls
Scenery
It may be a little too ambitious but we will see.
Posts: 1,288
Threads: 137
Joined: Jan 2009
tom if we always set the bar low, we never will get things done. that's why it's a Challange.
Jim
Posts: 2,539
Threads: 52
Joined: Dec 2008
One month into the challenge and I finally have begun working on the project.
The first thing I need to do is get the roadway in place. For the road I am going to use Walthers Asphalt Road System. Originally I was going to use Woodland Scenics Smooth It but trying to place the forms proved to be too difficult. I think the Walthers system will work best in the confined space. I may still use Smooth It to fill in gaps.
First step is to assemble the roadway sections.
Next place the roadway section in place to determine how everything will fit.
Posts: 2,539
Threads: 52
Joined: Dec 2008
With some tweaking two sections will fit nicely between the big bridge and the tunnel portal.
Add the tunnel portal to see how it looks.
Add the thru girder bridge to see how the sidewalk will fit.
I will need to add the rest of the sidewalk and glue everything down.
Posts: 1,288
Threads: 137
Joined: Jan 2009
Posts: 1,074
Threads: 17
Joined: Jun 2022
Smooth-It would definitely have been a real challenge in that space, Tom. It's always nice to have another option. We're looking forward to further progress.
Posts: 3,021
Threads: 160
Joined: Dec 2008
This is going to be a cool scene!
--
Kevin
Check out my Shapeways creations!
3-d printed items in HO/HOn3 and more!
<!-- m --><a class="postlink" href="https://www.shapeways.com/shops/kevin-s-model-train-detail-parts">https://www.shapeways.com/shops/kevin-s ... tail-parts</a><!-- m -->
Posts: 2,539
Threads: 52
Joined: Dec 2008
Thanks guys!
Here I have the sidewalk in place.
Sidewalk under the thru girder bridge
Sidewalk approaching the tunnel portal
Posts: 2,539
Threads: 52
Joined: Dec 2008
Next checking to see how the pedestrian portals will fit.
The portals are N scale tunnel portals from Chooch.
The pedestrian tunnels will connect to subway entrances which are there own challenge project.
Posts: 2,539
Threads: 52
Joined: Dec 2008
I glued the portals in place.
I added the track back to the thru girder.
Posts: 2,539
Threads: 52
Joined: Dec 2008
I used the base of the subway entrance to mark the foam that I will need to remove for the entrance.
Here is a shot of the entrance locations and the portals.
Posts: 6,582
Threads: 1,134
Joined: Nov 2008
Looks great!!
Don't forget the height restriction signs
Posts: 2,539
Threads: 52
Joined: Dec 2008
Posts: 295
Threads: 18
Joined: Nov 2015
That looks phenomenal!
————————————————————————————
Modeling the East Broad Top as it was between 1937-1942
~Amanda
Posts: 2,539
Threads: 52
Joined: Dec 2008
I finally got some work done. I used some spackle and smoothed out some rough areas and filled in holes and painted it.
I began adding some clump foliage around the tunnel wall.