08-02-2013, 02:37 PM
I've started working on ground cover in the new area. I got a good idea from another forum of using fireplace ash, and I happened to have some, so that's what I'm starting with, although I'll be blending other materials in after this dries.
Also, I began to realize that there's about 3 feet of track between the former end of the spur and the new switch at Sunkist, which could certainly be used for something like an unloading point for heavy-duty flats. Here's a prototype example:
But then I realized there's no reason I can't use it as an ordinary team track.
Also, I began to realize that there's about 3 feet of track between the former end of the spur and the new switch at Sunkist, which could certainly be used for something like an unloading point for heavy-duty flats. Here's a prototype example:
But then I realized there's no reason I can't use it as an ordinary team track.
