Freelance 2013-2 (MAW)
The funny thing is that the track plan has been very crowded initially. All the white marked switches in the fascia are out of operation. It was a long process to remove one switch at a time with each iteration of the layout.

This old photo shows a lot more switches and tracks.
[Image: Img_0132.jpg]
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)