10-12-2013, 11:26 AM
All the LEDs for the roundhouse are in place and hooked up, and Vigdis has just started on the interior detailing:
After the roof is put on, only the machine shop remains, then the building can be placed on the layout.
Svein
After the roof is put on, only the machine shop remains, then the building can be placed on the layout.
Svein