Ten-Wheelers for the Grand Valley....
#28
Finally, a little more progress to show, with most of the air system's piping in place. I still need to add pipe hangers for the two pipes extending forward from beneath the engineer's side of the cab (they duck behind the air tank on that side, and will re-appear on the pilot beam as air and signal lines). They're also fastened only temporarily under the cab floor, as the entire cab will have to come off in order to install the window "glass" after the loco has been painted. After that, the cab will be permanently attached to the boiler and all of the appropriate piping.


[Image: Ten-WheelersfortheGrandValley035.jpg]

[Image: Ten-WheelersfortheGrandValley032.jpg]


Wayne
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)