01-04-2014, 04:55 PM
All track building is complete, apart from laying the (Peco) tracks on the traverser and exit/entry roads.
The final bits have been electrically isolated, so all that is required is to remove and rinse them off to get rid of the flux residue.
Here are some photos of the final sections of track in situ.
Some 'aerial' shots'/ just above eye level shot to illustrate the track plan.
Next step will be to mark out the positions of the fishplates between each section of track, and then drill holes to accommodate the wires which will be sldered to them.
Jonte
The final bits have been electrically isolated, so all that is required is to remove and rinse them off to get rid of the flux residue.
Here are some photos of the final sections of track in situ.
Some 'aerial' shots'/ just above eye level shot to illustrate the track plan.
Next step will be to mark out the positions of the fishplates between each section of track, and then drill holes to accommodate the wires which will be sldered to them.
Jonte
